

• Beginner - 2 to 3 days
• Intermediate - 1 to 3 days
• Advanced - 1 to 2 days
Materials Needed
EDPM liner (see above for sizing)
Sand
Pump (optional)
2"x4" lumber
Tools Needed
Work gloves
Tape measure
Small Hand spade
Wheel barrow
Metal bow rake
Garden hose
If you want the Interactive version (Recommended) Then click on the "Watch" Tab..
http://www.easy2.com/cm/lowe/mons_ht_in ... 9646#watch